Amo.ng curated workflow

Deliver a Marketing Website from Approved Brief to Release Gate

Turn supplied offer and search evidence into an approved landing-page brief, implement that brief in an authorized repository, verify the actual change set, and prepare release and rollback controls without deploying it.

Workflow ID
AMO-W-000034
Steps
4
Published
Download Markdown

Copy workflow includes every step and the full linked Prompt content. Use with AI copies a shorter guide with Prompt links; neither action runs the Workflow.

Outcome

Approved page brief, brief-to-code traceability, change manifest, test record, unresolved integration register, release checklist, monitoring/rollback conditions, and an accountable go/no-go handoff.

Before you begin

Have all or some of the following available before you start. The more relevant context you can provide, the stronger the workflow output will be.

  • Offer and audience evidence
  • Proof points and claim restrictions
  • Conversion action
  • SEO/search evidence
  • Approved content/assets
  • Repository and test context
  • Route/form/integration boundaries
  • CI/CD, monitoring, and rollback context

Ordered sequence

Workflow steps

Complete the steps in order. For each step, provide the listed context, carry its result into the next step, and pause wherever a review note is shown.

  1. Step 1 SEO Landing Page Brief With Evidence-Backed Conversion Angles

    Convert supplied offer, search, audience, proof, and conversion evidence into an approved page brief.

    Prompt: SEO Landing Page Brief With Evidence-Backed Conversion Angles

    Input for this step

    Business objective, audience, proof, content constraints, search evidence.

    Carry forward

    Page architecture, claims/proof register, copy/asset requirements, CTA and acceptance boundaries for content-owner approval.

    Review note

    Stop if audience, offer, conversion action, claim authority, or approval owner is unresolved; do not continue until the content owner approves the brief and claim boundaries.

    Open prompt
  2. Step 2 Build a Marketing Website from an Approved Brief

    Implement the approved brief in the authorized repository.

    Prompt: Build a Marketing Website from an Approved Brief

    Input for this step

    Approved brief, repository context, approved assets, routes/forms/integrations, authorized scope.

    Carry forward

    Changed-file manifest, brief-to-page traceability, test evidence, blocked integrations, rollback instructions.

    Review note

    Stop for missing repository/authority, secrets, destructive or production actions, or a brief conflict.

    Open prompt
  3. Step 3 Production Test and Verification Plan Prompt

    Independently challenge the implementation with risk-based automated/manual verification.

    Prompt: Production Test and Verification Plan Prompt

    Input for this step

    Actual change set, acceptance criteria, test environment, commands, implementation evidence.

    Carry forward

    Test matrix, results, unrun checks, regression risks, observability and rollback verification needs.

    Review note

    Hold if the actual diff, acceptance criteria, or executable evidence is unavailable.

    Open prompt
  4. Step 4 CI/CD Deployment Safety Checklist Generator

    Review CI/CD, deployment, rollback, monitoring, and release-owner evidence.

    Prompt: CI/CD Deployment Safety Checklist Generator

    Input for this step

    Approved change set and test record, pipeline/deployment context, rollback and owner information.

    Carry forward

    Final release checklist, blockers, go/no-go conditions, rollback triggers, monitoring window, owner handoff.

    Review note

    Do not authorize deployment if approvals, rollback, secrets handling, or observable release evidence are incomplete.

    Open prompt

Completion criteria

Approved content and claims are traceable to implemented pages; relevant tests are actually run or marked unrun; forms/integrations remain safely bounded; accessibility/performance limitations are explicit; release, rollback, and monitoring owners have observable gates. DNS, hosting, live CMS data, production forms, analytics or advertising accounts, and deployment settings remain unchanged. Deployment is not claimed.

Was this useful?

Skills built from this Workflow

Browse Skills
Browse Workflows